Demolition Permit in Montgomery County, Maryland

Permit Required
Yes
Authority
Montgomery County
Fee
A bond in the same amount as the estimated cost of the demolition (minimum $400) must also be submitted.
Last Verified
2026-09-29
Apply for Permit

What the official source says

“A Demolition permit is required when any building is demolished in its entirety from a lot, or when less than 33 percent of the existing first-story exterior walls enclosing habitable space of a house above the basement or foundation are left in place.”

montgomerycountymd.gov

“A bond in the same amount as the estimated cost of the demolition (minimum $400) must also be submitted.”

montgomerycountymd.gov

“There is a 10-day notification period before your demolition permit may be issued.”

montgomerycountymd.gov

Verify before you build — primary source for this page: https://www.montgomerycountymd.gov/department-permitting-services/all-permits/residential-permits/residential-demolitions

Fees

A bond in the same amount as the estimated cost of the demolition (minimum $400) must also be submitted.

Application Process

Processing time: There is a 10-day notification period before your demolition permit may be issued..

Apply online →

How to apply

  1. Confirm the rules for your address with Montgomery County — the official sources on this page are the place to start.
  2. Prepare a simple site plan or drawing showing where the demolition work goes and its size.
  3. Submit the application online and pay the permit fee.
  4. Schedule the required inspections and keep the approved permit on site.

More detail: our demolition permit guide.

Building Department

Montgomery County

Official Sources

FAQ

Do I need a demolition permit in Montgomery County, Maryland?

Yes. A permit is required for demolition work in Montgomery County. The official source says: “A Demolition permit is required when any building is demolished in its entirety from a lot, or when less than 33 percent of the existing first-story exterior walls enclosing habitable space of a house above the basement or foundation are left in place.”

How much does a demolition permit cost in Montgomery County, and how long does it take?

Fee: A bond in the same amount as the estimated cost of the demolition (minimum $400) must also be submitted.. Processing time: There is a 10-day notification period before your demolition permit may be issued..

Where do I apply for a demolition permit in Montgomery County?

Applications go to Montgomery County. You can apply online: https://www.montgomerycountymd.gov/department-permitting-services/all-permits/residential-permits/residential-demolitions