Shed Permit in Santa Fe, New Mexico
- Permit Required
- Yes
- Authority
- City of Santa Fe
- Last Verified
- 2026-09-29
What the official source says
“Permits are required for the following exterior business signs roofing and re-roofing window replacement all storage sheds”
santafenm.gov
Verify before you build — primary source for this page: https://www.santafenm.gov/land-use/building-permits
New Mexico statewide rule
The state rule is the baseline everywhere in New Mexico; Santa Fe can add stricter local requirements.
- “One-story detached accessory structures provided that the floor area does not exceed 120 square feet (18.58 m2).” source: srca.nm.gov
- “One-story detached accessory structures provided that the floor area does not exceed 120 square feet (18.58 m2).” source: srca.nm.gov
How to apply
- Confirm the rules for your address with City of Santa Fe — the official sources on this page are the place to start.
- Prepare a simple site plan or drawing showing where the shed work goes and its size.
- Submit the application and pay the permit fee.
- Schedule the required inspections and keep the approved permit on site.
More detail: our shed permit guide.
Building Department
City of Santa Fe
Official Sources
FAQ
Do I need a shed permit in Santa Fe, New Mexico?
Yes. A permit is required for shed work in Santa Fe. The official source says: “Permits are required for the following exterior business signs roofing and re-roofing window replacement all storage sheds”
Where do I apply for a shed permit in Santa Fe?
Applications go to City of Santa Fe.