Information may be inaccurate or out of date. Always confirm permit requirements with the official city, county or state website before you start work. Read our disclaimer

Demolition Permit in Portland, Oregon

Permit Required
Unknown
Authority
City of Portland
Maximum Height
15 ft
Last Verified
2026-09-29
Visit Building Department

What the official source says

“Build, demolish or move any structure that is more than 200 square feet in area or has a height of more than 15 feet measured from the grade plane to the average height of the highest roof surface.”

portland.gov

Verify before you build — primary source for this page: https://www.portland.gov/ppd/residential-permitting/do-you-need-permit/residential-permits

Size / Height Limits

Maximum size without a permit: 200 sq ft.

Maximum height without a permit: 15 ft.

How to apply

  1. Confirm the rules for your address with City of Portland — the official sources on this page are the place to start.
  2. Prepare a simple site plan or drawing showing where the demolition work goes and its size.
  3. Submit the application and pay the permit fee.
  4. Schedule the required inspections and keep the approved permit on site.

More detail: our demolition permit guide.

Building Department

City of Portland

Official Sources

FAQ

Is there a size or height limit before a demolition permit is needed in Portland?

The verified threshold is 15 ft in height and 200 sq ft in area.

Where do I apply for a demolition permit in Portland?

Applications go to City of Portland.

Demolition Permits - All Cities

Report an error on this page