Building Permits in Seattle, Washington
Part of King County.
We checked Seattle's own official pages for 8 types of projects (shed, fence, deck, roof, garage, tree removal, adu, demolition). Permits are issued by City of Seattle building department. Every rule below links to the page it was taken from, so you can confirm it before you start work. Last verified September 29, 2026.
Verified permit information is available for 6 project types in Seattle.
Verified Permit Categories
- Shed Permit Verified details
- Fence Permit Verified details
- Garage Permit Verified details
- Tree Removal Permit Depends
- ADU Permit Verified details
- Demolition Permit Yes
Seattle rules in detail
Shed
- Size limit (sq ft)
- 120 source: seattle.gov
- Conditions
- All other sheds require a permit; most require only a subject-to-field-inspection permit source: seattle.gov
- Setback (ft)
- 10-15 feet front, five feet side (NR zones) source: seattle.gov
Fence
- Height limit (ft)
- 8 source: seattle.gov
- Conditions
- A construction permit is required if the fence has masonry or concrete elements over 6 feet, or if it will be located in a flood-prone area. source: seattle.gov
Deck
- Conditions
- A permit is required for a deck that is more than 18 inches above the ground, is a roof deck, or is in an environmentally critical area (ECA). source: seattle.gov
Roof
- Size limit (sq ft)
- 500 source: seattle.gov
- Exempt from a permit
- A permit is not required for re-roof work at one- and two-family homes and townhouses if no changes are made to the building envelope other than adding or replacing insulation, and the insulation value is equivalent to or better than the existing structure. source: seattle.gov
Garage
- Conditions
- The property where you will build your garage must not be in an environmentally critical area. source: seattle.gov
- Setback (ft)
- 20 ft front, 5 ft side source: seattle.gov
Tree Removal
- Permit required
- Depends source: seattle.gov
ADU
- Conditions
- While some property may be large enough to have four or more units, only two of them may be ADUs. source: seattle.gov
Demolition
- Conditions
- You must meet asbestos survey requirements before you can obtain a demolition permit. source: seattle.gov
- Permit required
- Yes source: seattle.gov
Not yet verified
These permit categories do not yet have enough verified information to publish a linked permit page.
- Deck
- Roof
- Pool
- Patio
- Pergola
- Carport
- Solar Panels
- HVAC
- Electrical
- Plumbing
- Driveway
- Home Addition
- Windows
- Water Heater
Where to apply
City of Seattle building department · official website · apply online
Washington statewide rules
State defaults apply everywhere in the state; cities and counties may add stricter local rules.
- Issued by
- State Building Code Council source: app.leg.wa.gov
- Building code
- 2021 edition of the International Residential Code source: app.leg.wa.gov
- Local changes allowed
- Limited source: app.leg.wa.gov
ADU
- Conditions
- A city or county must allow at least two accessory dwelling units on lots in urban growth area zoning districts that allow single-family homes. source: app.leg.wa.gov