Shed Permit in Green Bay, Wisconsin

Permit Required
Depends
Authority
City of Green Bay
Setback
Front setback 25 ft; rear setback 4 ft (2-½ ft if lot narrower than 90 ft); side setback 4 ft (2-½ ft if lot narrower than 60 ft) ft
Last Verified
2026-09-29
Visit Building Department

What the official source says

“Shed Only If Over 50 SF Yes Inspections”

greenbaywi.gov

“If the shed is less than 50 sq. ft. a building permit is not required.”

greenbaywi.gov

“Setbacks for detached sheds: Front setback = 25 ft. Rear setback = 4 ft. (2-½ ft. if lot is smaller than 90 ft.wide) Side setback = 4 ft. (2-½ ft. if lot is smaller than 60 ft.wide)”

greenbaywi.gov

Verify before you build — primary source for this page: https://www.greenbaywi.gov/1603/Shed-Permit

Permit Requirements

Exemptions

Sheds less than 50 square feet do not require a building permit.

Size / Height Limits

Maximum size without a permit: 50 sq ft.

Setbacks

Minimum setback: Front setback 25 ft; rear setback 4 ft (2-½ ft if lot narrower than 90 ft); side setback 4 ft (2-½ ft if lot narrower than 60 ft) ft.

Application Process

Processing time: 3 to 5 business days.

How to apply

  1. Confirm the rules for your address with City of Green Bay — the official sources on this page are the place to start.
  2. Prepare a simple site plan or drawing showing where the shed work goes and its size.
  3. Submit the application and pay the permit fee.
  4. Schedule the required inspections and keep the approved permit on site.

More detail: our shed permit guide.

Building Department

City of Green Bay

Official Sources

FAQ

Do I need a shed permit in Green Bay, Wisconsin?

It depends on the project. The official source says: “Shed Only If Over 50 SF Yes Inspections”

Is there a size or height limit before a shed permit is needed in Green Bay?

The verified threshold is 50 sq ft in area. Exempt: Sheds less than 50 square feet do not require a building permit.

How much does a shed permit cost in Green Bay, and how long does it take?

The fee is set by the local permit office. Processing time: 3 to 5 business days.

Where do I apply for a shed permit in Green Bay?

Applications go to City of Green Bay.