Demolition Permit in Green Bay, Wisconsin
- Permit Required
- Unknown
- Authority
- City of Green Bay
- Last Verified
- 2026-09-29
What the official source says
“Raze Buildings Under 150 SF No”
greenbaywi.gov
“Raze Building Over 150 SF”
greenbaywi.gov
Verify before you build — primary source for this page: https://www.greenbaywi.gov/977/Do-I-Need-a-Permit
Permit Requirements
A permit is required to raze a building over 150 square feet.
Exemptions
Razing a building under 150 square feet does not require a permit.
Size / Height Limits
Maximum size without a permit: 150 sq ft.
How to apply
- Confirm the rules for your address with City of Green Bay — the official sources on this page are the place to start.
- Prepare a simple site plan or drawing showing where the demolition work goes and its size.
- Submit the application and pay the permit fee.
- Schedule the required inspections and keep the approved permit on site.
More detail: our demolition permit guide.
Building Department
City of Green Bay
Official Sources
FAQ
Is there a size or height limit before a demolition permit is needed in Green Bay?
The verified threshold is 150 sq ft in area. Exempt: Razing a building under 150 square feet does not require a permit.
Where do I apply for a demolition permit in Green Bay?
Applications go to City of Green Bay.